Drying equipment needs to match the water loss, room layout and materials. Before hiring, ask how the equipment should be placed, what power and safety conditions apply, and how moisture progress will be checked.
Describe the job first
Share the water source, affected rooms, materials, property type and whether the leak is still active. Sewage and floodwater exposure need more than a generic equipment hire decision.
Mention access, stairs, strata rules, children or pets, power availability and any electrical concerns. These details affect a safe setup.
Ask what the hire includes
Confirm delivery, setup, operating instructions, collection, after-hours support and whether moisture monitoring is included. Clarify the hire period and costs before equipment is placed.
Air movement and dehumidification work together in many drying setups, but equipment alone does not reveal hidden moisture or repair the source.
Do not operate equipment in unsafe conditions
Keep cords and equipment away from standing water and follow all instructions. Never use petrol or diesel-powered equipment indoors.
If the damage spans several rooms, concealed cavities or contaminated water, ask whether a restoration assessment is more suitable than equipment-only hire. Learn about equipment hire and installation.
Frequently asked questions
Can equipment hire replace a restoration assessment?
Not always. The job may need source control, extraction, material checks and monitoring as well as drying equipment.
How long should a dehumidifier run?
There is no universal runtime. Site conditions and readings should guide the drying period.
General information only. The correct response depends on the water source, materials and site safety. This is not electrical, plumbing, medical or insurance advice. Call 000 for immediate danger.
Related: equipment hire and installation · view all service areas.
